Redemption completed the design and permitting processes for a driveway stream crossing project. The project includes the reconstruction of an existing drive crossing and required permitting through DNR, IDEM, and USACE. Three 30-inch CMP pipes will be replaced with a 4’ x 6’ box culvert. The driveway is currently inundated during significant rainfall events. This project will raise the drive so that the property owners can pass over the waterway during major storms. The improvements will also improve stream health by providing an open, natural passage beneath the driveway for aquatic life.